Taizhou Huangyan Yongsheng Mould Co., Ltd. >> Plastic table with Plastic Stool Mould (YS11)

Plastic table with Plastic Stool Mould (YS11)

Plastic table with Plastic Stool Mould (YS11)
Price: US $ 8000-9000/Set
Trade Terms: FOB,CIF
Min Order: 1/Set
Pay Type: L/C,T/T,Western Union
Prod Model: YS11
Markets: North America,South America,Eastern Europe,Southeast Asia,Africa,Oceania,Mid East,Eastern Asia,Western Europe
Name: Plastic Stool Mould
Size: All Kinds
Cavity: Single
Tooling Machine: CNC
Cavity/Core Steel: P20, 718
Mould Base: Lkm, Hasco, Dme
Mould Time: 35-45s
Lead Time: 45-50days
Shaping Mode: Injection Mould
Process Combination Type: Single-Process Mode
Application: Home Use
Installation: Fixed
Plastic Material: PP/PC/ABS
Runner: Hot

Product Description

Plastic Stool mould
1. Mould life: 500, 000 to 1, 000, 000shots
2. Mould cavity/core: P20, 718
3. Lead time: 45-50days




Name
Stool mould
Mould material
45#, P20, H13, 718, 2738, NAK80, S136etc.
Mould base
LKM, HASCOect.
Cavity
Single/multi
Runner
Hot/cold
Mould life
45#: 300, 000-500, 000shots
P20: 500, 000shots
718: 700, 000shots
Design software
UG, PROE, CADetc.
Plastic material
PP, PE, ABS, PCetc.
Delivery time
35-60days
Specification
According to client's requirements

Stool mould
1. Samples/Drawing &Requirement from you
2. Mould design: We will Communicate&Exchange the opinion with you after you place order.
3. Material Purchase: Steel cutting and Mould base tooling.
4. Assembling.
5. Inspection of mould: Following and controlling the tooling processing.
6. Mould testing: We will inform you the date. Than will send the sample's inspection report&injection parameters with the sample to you!
7. Your instruction &confirmation for shipment.
8. Ready made mould before packing.
Step


1. R& DWe  support  customer  R& D.   Make  the  files  or  improve  the  design  if  you  needed.
            ↓
2. Negotiationthe  quality,   price,   material,   delivery  time,   payment  item,   ect.
            ↓
3. Place  an  orderaccording  your  own  design  or  you  chooses  our  design.
4.   MouldAccording  customers  request  to  build  the  mould.   Before  make  the  mould,   we  send  mould  design  to  customer  approval  first,   before  move  forward  to  production;   we  send  samples  to  customer  to  confirm  first.
            ↓
5.   Sample  shootIf  the  first  sample  come  out  is  not  satisfied  customer,   we  modify  the  mould  and  until  meet  customers  satisfactory.
            ↓
6. Products  in  storeIf  your  quantity  is  beyond  our  storage,   we  will  provide  lead  time  to  you.
            ↓
7.   Delivery  timeDelivery  goods  by  sea  or  by  air,   according  customers  requirement
Taizhou Huangyan Yongsheng Mould Co., Ltd, founded in 2007, is located at Zhejiang province. It is near Hangzhou and Ningbo port. And domestic flights can arrive directly. You can go anywhere freely. Our company covers an area of more than 1, 000 meters. We are specializing in the development, production and sales of no gate hot runner cap mould, cut-free independent self-locking gate perform mould, free-gate valve perform mould, anti-theft cap mould, die cut cap mould, handle mould, bottles mould and daily necessities mould. Now we have had first-class experts and production machines.

After many years of efforts and sustained fast developments, we have obtained customers' recognition with our scale, quality and good faith. Now we have got a clear advantage on technologies and equipments levels, quality grades, market share etc. And our core competencies are keeping on being stronger and stronger. It goes without saying that our company will develop steadily, rapidly and healthily. In order to be more professional, solider, stronger and bigger, we insist on perfect quality, good faith and customers first from our foundation, never stopped developing technologies and products.

Now our products are popular in domestic market, and become a famous national brand. In oversea market, they are sold to Americas, Europe, Middle East, Africa and Southeast Asia. We will keep on fast development, strengthening personnel training and introduction, developing technologies, enhancing the capability of independent innovation, accelerating new plastic perform development, improving technology progress and industry upgrade, and carry out "going-out" strategy seriously, take part in the competition actively to open much wider market all over the world.

"YONGSHENG- keeps up with times and makes friends with all over the world

Send your message to this manufacturer

  • Taizhou Huangyan Yongsheng Mould Co., Ltd.

More >

Other Products with This Manufacturers