Name |
Description |
|
|
Products' infomation we need to make quotation |
Clear Pics/material/size/weight/wall thickness/targetting quantity and etc. |
|
|
Mould Material |
45#, 50#, P20, H13, 718, 2738, NAk80, S136, SKd61 etc |
|
|
Mould Base |
LKM, HASCO ect. |
|
|
Cavity |
Single/multi |
|
|
Runner |
Hot/cold |
|
|
Mould Design |
3D/2D Drawing |
|
|
Design Days |
3 days |
|
|
Design Software |
UG, PROE, CAD, CAE, CAM, CAXA ect |
|
|
Plastic Material |
PP, PC, PS, PE, PU, PVC, ABS, PMMA ect |
|
|
Mould Life |
300, 000-3, 000, 000 shots |
|
|
Injection System |
Pin-point-gate |
|
|
Polish System |
Mirror Polish |
|
|
Payment |
40% of Deposit by T/T, 60% of Balance by T/T |
|
|
Delivery Time |
15-60days |
|
|
Specification |
Depends on customers requirements |
|
|
Business Step |
1. R& D |
We support customer R& D. Make the files or improve the design if you needed |
↓ ↓ ↓ |
2. Quotation Making |
Mould Quotation will be finished in 1 day according to information we get |
↓ ↓ ↓ |
3. Negotiation |
The quality, price, material, delivery time. payment item. ect |
↓ ↓ ↓ |
4. Mould Design |
3-5 days for mould and product 3D/2D drawing design |
↓ ↓ ↓ |
5. Mould |
According to customers' request to build the mould. Before make the mould. we send mould design to customer approval first. Mould will be usually finished in 25-60 days |
↓ ↓ ↓ |
6. Mould Testing |
When moulds are finished, we will test the moulds to check it satified consumers' needs. And we will send samples for consumers' reference. |
↓ ↓ ↓ |
7. Sample shoot |
If the first sample come out is not satisfied customer. we modify the mould and until meet customers satisfactory |
↓ ↓ ↓ |
8. Delivery |
Delivery goods by sea or by air, according customers requirement |